ASME PTC 47-2020

$108.00

Integrated Gasification Combined Cycle Power Generation Plants

Published by ASME International, 07/23/2021

PDF

All of our standards are only available in PDF (Portable Document Format), an electronic, downloadable format.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

ASME PTC 47, 2020 year – Integrated Gasification Combined Cycle Power Generation Plants

This Code covers a defined range of primary fuel characteristics, but is limited to combined-cycle, power generation systems using gas and steam turbines. This Code defines the boundaries of the overall IGCC power plant to encompass three major plant sections – the air separation unit (ASU, for oxygen-blown gasifiers or plants that use nitrogen), the gasification process (including gas cleanup), and the power block. Tests conducted by this Code determine the quantity and quality of fuel gas by its flow, temperature, pressure, composition, heating value, and its content of contaminants. Contaminants are compounds that are potentially deleterious to the gas turbine and power block in general, or are precursors to stack emissions. Contaminants to be measured are sodium (Na), potassium (K), vanadium (V), lead (Pb), calcium (Ca), barium (Ba), manganese (Mn), phosphorus (P), sulfur compounds (H2S and COS), nitrogen compounds (HCN and NH3), chlorine compounds (HCl), and particulate matter.

Recommendations are included for the following in pretest agreements: testing procedures, types of instruments, methods of measurement, methods of calculation, and contents of test reports.

Regulatory compliance testing of IGCC power plants is not covered by this Code.

General Product Information:

Document Type PDF
ISBN
Pages 110
Document Language English
Publisher American Society of Mechanical Engineers (ASME)
Status Current

Preview

Document History